Large ground-mounted solar array at an industrial park
Industrial solar

Solar power plants for Nigerian industry.

Ground-mount and rooftop solar, battery energy storage and diesel fuel-saver integration for factories, warehouses and industrial estates — sized from measured load data.

Systems from
50 kVA / 50 kWp
Pricing
Custom quotation
Industrial electricity challenges

Energy cost is now a production cost.

For manufacturers, power affects cost of goods, uptime, product quality and export competitiveness.

01

Diesel cost per unit produced

Long production shifts on diesel generation tie energy cost directly to fuel price volatility.

02

Fuel logistics and security

Deliveries, storage, pilferage risk and supply disruptions add operational burden.

03

Process interruptions

Outages and changeover gaps disrupt production lines, cold chains and control systems.

04

Generator wear

Continuous running accelerates overhaul cycles and increases failure risk.

05

Power quality

Voltage dips, imbalance and harmonics affect motors, drives and PLCs.

06

Export and ESG requirements

Buyers and group headquarters increasingly ask for measured emissions reduction.

How an industrial plant is built

From bare land to a commissioned power plant.

Industrial projects are delivered in phases alongside an operating factory, with method statements, HSE plans and supervised changeover at every stage.

  1. Factory site before solar installation, with existing generator plant

    01 · Before

    Factory running on diesel generation; land assessed for a ground-mount array.

  2. Site preparation and foundations for an industrial ground-mount solar array

    02 · Civil works

    Site clearing, set-out and foundations for mounting structures and the power house.

  3. Mounting structures being erected for an industrial solar array

    03 · Structures

    Galvanised mounting structures erected and aligned to the design tilt.

  4. Industrial solar plant under construction with modules being installed beside a factory

    04 · Modules

    Modules installed in strings, with DC cabling routed to combiner boxes.

  5. Completed ground-mount solar array beside a manufacturing facility

    05 · Commissioned

    Hybrid plant integrated with storage and the existing generators.

Load profiling & energy audit

We measure before we design.

Industrial systems are sized from interval data across your shift pattern — not from nameplate ratings.

  • Power-quality and load logging on main incomers across production shifts
  • Diesel purchase records, generator hour meters and fuel-efficiency analysis
  • Motor starting currents, power factor and harmonic assessment
  • Critical, deferrable and shiftable process loads identified
Engineers reviewing system performance data on a tablet at a solar array
MBB Energy engineering team in front of battery energy storage cabinets
Commercial plant room with hybrid inverters, battery racks and distribution boards
DC and AC protection and distribution boards with labelled breakers and surge protection
Battery storage & hybrid control

Storage that works with your generators.

Diesel fuel-saver operation

Solar carries daytime load while the controller keeps generators at efficient loading — or off — reducing fuel burn and running hours.

Battery energy storage (BESS)

LiFePO₄ storage bridges shift changeovers and outages, absorbs surplus solar and reduces generator start-ups. Capacity and C-rate are chosen against your duty cycle.

Grid, generator and solar integration

Three-phase changeover, protection coordination and earthing designed to integrate safely with existing switchgear.

MBB Industrial

Custom-engineered systems.

Every industrial plant is quoted after an energy audit and feasibility study. Our Ota reference project shows a typical starting configuration.

Ground-mounted solar array serving an industrial estate
Ground-mount solar array beside a warehouse and logistics facility
IndustrialThree phase

MBB Industrial

Engineered hybrid systems and battery storage for factories, plants and warehouses — designed from measured load data.

Inverterfrom 50 kVA
Solar50 kWp
Storage100 kWh

≈ 5.4 hours estimated battery backup at a 15,000 W average load (90% usable capacity, 90% efficiency, no solar input; heavier loads reduce backup time).

Supports, for example

  • Process and production loads
  • HVAC and cold chain
  • Critical facility loads
  • Diesel fuel-saver operation
  • Grid / generator hybrid integration

Equipment specification

  • SystemThree phase, 91 × 550 Wp modules
  • InverterHybrid inverter — Deye / Growatt / Victron Energy
  • ModulesTier-1 monocrystalline modules — Jinko Solar / LONGi / JA Solar
  • BatteryLiFePO₄ lithium storage — Dyness / Pylontech / Felicity Solar
  • ProtectionDC/AC isolation, SPD & breakers — Schneider Electric / Chint

Final brand and model are confirmed in your quotation, subject to availability.

Warranty

Panels 12 years product · 25 years linear performance · Inverter 5 years · Batteries 5 years · Workmanship 2 years

Installation scope

  • Energy audit and load profiling
  • Feasibility and financial model
  • Detailed electrical and structural design
  • Installation, integration and commissioning
  • Commercial Care O&M agreement (optional)
  • Monitoring and performance reporting
Financial modelling

Model your diesel displacement.

A first view of savings for a 50 kVA / 50 kWp / 100 kWh plant (≈ ₦80.5m at MBB unit rates). Replace every input with your own figures.

Calculator · Generator vs solar

Compare what you spend now with a solar system

Typical at average load; check your own usage.
Example value — update to today’s pump price.
Servicing, oil, filters and repairs, spread per hour run.
Share of today’s generator and grid spend the solar system is expected to replace.
Use the sizing calculator or a quotation; the default is an example only.
Adjust advanced assumptions
Preliminary comparison

Indicative — based entirely on the values you enter.

Annual generator cost—
Annual grid cost—
Annual potential savings—
Detailed results

Unlock your full breakdown and PDF assessment

Receive the detailed figures, a downloadable indicative assessment and a WhatsApp summary. An engineer can then review your inputs.

Assumptions and method
  • Annual generator cost = (litres/hour × fuel price + maintenance/hour) × hours/day × days/month × 12.
  • Solar operating cost = remaining generator & grid spend × (1 − solar contribution) + O&M.
  • Annual savings = current annual spend − solar operating cost. Payback = system cost ÷ annual savings.
  • Five-year view applies the annual cost increase to fuel and grid spend, includes the system cost upfront, and includes battery replacement only if it falls within five years.
  • Excludes financing costs, generator resale value and changes in your usage.
Operations & maintenance

Commercial Care for industrial plants.

From ₦350,000 per year: monitoring, quarterly preventive maintenance, module cleaning, thermal inspection and performance reporting.

View maintenance plans
MBB Energy project team at a completed ground-mounted solar array
FAQs

Industrial questions.

Do I need a three-phase system?

Three-phase systems are typically required where the building has a three-phase supply and significant three-phase loads such as large motors, lifts or industrial equipment. Many homes and small businesses operate on single phase. An engineer confirms this during the site assessment.

Do you offer maintenance contracts?

Yes. Essential Care (₦75,000 per year) covers an annual inspection and cleaning; Premium Care (₦150,000 per year) adds a second visit, proactive monitoring and priority response; Commercial Care (from ₦350,000 per year) provides quarterly maintenance and performance reporting for commercial and industrial systems.

Industrial consultation

Request an industrial energy consultation.

Share your facility type, shift pattern, consumption and diesel use. Our enterprise team will propose a load study and feasibility assessment.

  • Discovery call with an engineer
  • Data request: bills, diesel records, single-line diagram
  • Site visit and load logging
  • Feasibility report, financial model and proposal

Your enterprise adviser: Chika Nwankwo

WhatsApp