Completed ground-mount solar array beside a manufacturing facility
Industrial project · Ota, Ogun State

Ota manufacturing facility

A ground-mount hybrid plant with battery storage, built in phases alongside an operating factory.

Demonstration project. Configuration is representative of MBB Energy systems; results shown are design estimates until measured data is published.

Location
Ota, Ogun State
Customer type
Manufacturing plant
Category
Industrial
Project capacity
50 kVA · 50 kWp · 100 kWh
01 · Initial challenge

The situation before installation.

The factory depended on diesel generation for long production shifts. Fuel logistics, price volatility and generator wear were raising the cost of every unit produced.

02 · Energy requirements
  • Load profiling across production shifts
  • ≈ 35 kW daytime base load
  • Storage to cover shift changeovers and reduce generator starts
03 · System configuration
  • Inverter50 kVA three-phase hybrid inverter system
  • Solar array50 kWp ground-mount — 91 × 550 Wp modules
  • Battery storage100 kWh LiFePO₄ battery energy storage
  • IntegrationDiesel fuel-saver control with grid backup
  • O&MCommercial Care agreement with remote monitoring
04 · Installation images
05 · Results

Design outcomes.

  • Design yield ≈ 61,594 kWh of solar energy per year (4.5 peak sun hours, 75% system efficiency)
  • Battery reserve ≈ 5.4 hours at a 15,000 W average load
  • Measured generator-runtime and fuel savings will be published after 12 months of monitoring data
06 · Customer feedback
Customer feedback will be published here with the client’s written permission.
Awaiting verified feedback
Next step

Discuss a similar project.

Share your property type and current energy costs; we will recommend a configuration and arrange a site assessment.

WhatsApp